| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Pomperaug River Watershed ACT Summary* |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
As Of: 02/03/2012 For the BioPeriod: Overwintering |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Pomperaug |
|
Nonnewaug |
|
Weekeepeemee |
|
|
| |
|
|
|
As Of: |
01/29/12 |
ACT Status & |
|
02/03/12 |
ACT Status & |
|
02/03/12 |
ACT Status & |
|
|
| |
|
|
|
Discharge Flow
(cfs): |
233 |
Days Duration |
33 |
Days Duration |
49 |
Days Duration |
|
| |
Rare Event
- Level 3 |
|
0 |
|
|
0 |
|
|
0 |
|
|
| |
|
|
Flow
Threshold (cfs) |
9 |
|
14 |
|
3 |
|
|
| |
|
|
Persistent Days Duration |
10 |
|
5 |
|
15 |
|
|
| |
|
|
Catastrophic Days Duaration |
10 |
|
10 |
|
15 |
|
|
| |
Critical Event
- Level 2 |
|
0 |
|
|
4 |
|
|
0 |
|
|
| |
|
|
Flow
Threshold (cfs) |
31 |
|
41 |
|
9 |
|
|
| |
|
|
Persistent Days Duration |
20 |
|
5 |
|
20 |
|
|
| |
|
|
Catastrophic Days Duaration |
20 |
|
10 |
|
35 |
|
|
| |
Common
Event - Level 1 |
|
0 |
|
|
31 |
|
|
0 |
|
|
| |
|
|
Flow Threshold (cfs) |
164 |
|
122 |
|
48 |
|
|
| |
|
|
Persistent Days Duration |
37 |
|
20 |
|
37 |
|
|
| |
|
|
Catastrophic Days Duaration |
43 |
|
40 |
|
43 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
ACT Status Color Code Legend |
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
=
Discharge Flow either above the Flow Threshold or below but within the
timeframe of Persistent Days Duration |
|
|
| |
|
|
|
=
Discharge Flow below the Flow Threshold for Persistent Days Duration or
more. Preparatory management actions
required. |
|
| |
|
|
|
= Discharge Flow below the Flow Threshold
for Catastrophic Days Duration or more.
Mandatory management measures in effect. |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
* |
Based on
the 2005 UMass MesoHABSIM study ACTogram (Assessment of Continuous Thresholds) images for the assessment and |
| |
|
management of flows. |
|
|
|
|
|
|
|
Updated:
2/4/2012 - 1:30 PM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|