Draft Watershed Based Plan Now Available

September 17, 2018

Culminating a multi-year planning process, PRWC is pleased to share a Final DRAFT version of the Pomperaug Watershed Based Based Plan (WBP). This Final Draft version is under final review by our Land Use Committee, who has served as the project steering committee.  Upon their review, the committee will advise the PRWC Board of Directors how to proceed with adoption of the Plan in the coming weeks.  

 

While a formal public comment period is a required element in the development of this Plan, public input on these documents is welcome.  For consideration in the final version of the Plan, input must be received prior to Noon on Friday September 21, 2018.

 

Final DRAFT Pomperaug Watershed Based Plan 
(6.6 MB - optimized)


Appendix A - Quality Assurance Project Plan 


Appendix B - Field Assessments
 (8.4 MB)


Appendix C - Pollutant Loading Model 


Appendix D - BMP Prioritization Matrix


Appendix E - Estimated Costs


Appendix F - Land Use Committee Meetings
 (22 MB)


Appendix G - Public Meetings
 (24 MB)


Appendix H - Funding Sources Table

 


For additional information about the local water quality conditions or the Watershed Planning process,
please contact PRWC at 203-263-076. Questions or comments on the Final DRAFT WBP may be directed
to Carol Haskins at outreach@pomperaug.org.

 

 

Please reload

Featured Posts

Meet the Outreach Coordinator

November 12, 2019

1/10
Please reload

Recent Posts
Please reload

Follow Us
  • Facebook Basic Square
  • Instagram App Icon
  • Pinterest App Icon